Construction of water network Joanka-Dopiewiec

– Stage I

The subject of the contract was Investor’s Supervision in the implementation of tasks: Construction of water network Joanka-Dopiewiec Stage I.

 

Characteristic

realization of water supply system for the Department of Municipal Services in Dopiewo on the section from the Water Treatment Plant in Joanka to Konarzewo.
the waterpipe is located on agricultural land and public roads
water supply network of pipes PE 100 (RC) SDR17 PN 10 ø 400×23,7 mm, total length of 3 699,7 m
section I – total length of pipeline – 2675,40 rm, from W1 to K1 in Stęszewska street, executed in open excavation (except two water pipeline cross passes under existing drain ditches and one cross pass under existing street – executed by HDD (horizontal directional drill))
section II = 1 024,30 rm from the working chamber K-1 to W31 made by controlled drilling in the lane of asphalt roadway of Stęszewska street .

Construction of water network Joanka-Dopiewiec

Scope of work

Construction supervision in all industries

Customer

Department of municipal services Sp. o.o. based in Dopiewo

References

Exceptional Talent

Construction of water network Joanka-Dopiewiec

  • +48 61 624 74 55
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

Wszelkie prawa zastrzeżone KKBud Sp. z o.o.

Wykonane przez: Empressia

  • +48 61 624 74 55
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

All rights reserved by KKBud Sp. z o.o.

Realization: Empressia