The subject of the contract was the service of performing the duties of the Contract Engineer along with the provision of investor's supervision and author's supervision services in the preparation and implementation of the investment task under the name: Construction of a rainwater sewage system with pretreatment devices at ul. St. Wawrzyńca - exit A39.
Characteristics of the object:
Construction of a rainwater sewage system and installation of devices for treating rainwater and snowmelt before introducing them into the Bogdanka river receiver in order to protect it against pollution. The works included, among others:
Technical data:
total length of the sewage network L = 24.8 m, pipes with a diameter of 600 mm
distribution well with an overflow and a flow regulator (SP) with an internal diameter 4,000 mm and a depth of 4.13 m
connection well with a depth of 3.91 m, internal diameter 2000 mm
whirlpool 1: total depth 7.35 m, outer diameter of the tank 6000 mm, volume 207.71 m³, total weight 94 800 kg
whirlpool 2: total depth 7.30 m, outer diameter of the tank 3300 mm, volume 62.41 m³, total weight 34 800 kg
oil separator: total depth 6.07 m, outer diameter of the tank 3300 mm, volume 51.98 m³
PIM company based in Poznań, acting on behalf of and for the benefit of the City of Poznań
October 2018