The subject of the contract was project manager from the design phase through to the building’s completion together with the tender procedures.
The project itself involved the construction of a modern office building for Transgourmet by adding five stories to the HoReCa logistics hall located within the Selgros complex in Poznań.
Characteristics of the object:
addition of 5 office floors to the HoReCa logistics hall located in the Selgros complex in Poznań
Modern office spaces tailored to Transgourmet’s requirements, featuring meeting rooms, conference rooms, and a separate executive suite
8 210 m2
2 elevators, 2 stairwells
prefabricated structure
530 meters of floor ducts, 2.5 kilometers of cable runs, 180 kilometers of cabling
1,500 LED light fixtures, 1,020 computer outlets
Fire alarm system, public address system, BMS system
Heating system with heat recovery from the cold storage and freezer rooms of the Selgros sales hall; additional power is obtained from CO2-based air source heat pumps
Building cooling using chilled water produced by CO2-based air source heat pumps
51.6 km of underfloor heating/cooling pipes
Backup thermal energy source from the city in case of heat pump failure
Ventilation system with 4,480 m² of ventilation ductwork